Daycare and childcare websites
What their customers come to the site to do
- Check for a space in the right age group
- Book a tour of the centre
- Read the policies before applying

From $1,500CAD per project, plus HST
Last reviewed
What their customers come to the site to do

From $1,500CAD per project, plus HST
Last reviewed
Five things, quickly: whether you are licensed, your hours, the age groups and ratios, what it costs including the CWELCC reduction, and whether a spot exists. Then photos of the actual rooms, your staff qualifications, the daily routine and the food. A waitlist form asking the child's birth month and preferred start date is what turns the visit into an enquiry.
| Typical timeline | Typically two to three weeks for one page; typically four to six weeks for five to ten |
|---|---|
| Typical size | One landing page, built around a single conversion, or a custom site of five to ten pages |
| Waitlist form | 6 fields, including start month |
| Fees | Daily rate, CWELCC reduction, subsidy path |
| Photos | Only with written consent, swappable in minutes |
| What you supply | Licence, ratios, fees, routine, policies |
| Price | From $1,500 CAD + HST |
| Plan fit | Essentials, $250 a month |
What is different
The constraints on the right are the pages the site needs because of them.
Pages this site needs
Parent name, contact, child's birth month, preferred start month, days needed, and whether they have a sibling enrolled. Six fields, and every one of them helps you sort the list. A generic contact form makes you phone thirty people to find out who you can actually place.
Parents arrive already confused about what they will pay. Say the daily rate, say whether you are enrolled in the CWELCC funding programme and what the reduced fee works out to, and name the municipal subsidy path. This is the page that decides whether they call you or the centre down the road.
Your licence, your age groups and capacity, ratios, staff qualifications and first aid, the sick-child policy, and how you handle allergies. Parents want to verify rather than be reassured, so we link to the provincial licence record instead of just claiming it.
Every photo of a child needs a signed consent from that family, and consent can be withdrawn. We build the site so photos are swappable in minutes without a developer, and we can carry the whole site on room photos and detail shots if you would rather show no faces at all.
Evidence
Three childcare projects: a study drawn around the waitlist a parent checks first, a site concept drawn to the sector's rules, and an identity tested on the things a centre actually prints.
Child care · concept siteConcept

The waitlist position by age group, updated weekly, today's menu, CWELCC explained, and a tour booking, with no identifiable children.
Russet Early Learning — the four age-group shapes on the cubbies, the same as on the waitlist · studio concept
Daycare · site conceptConcept

A childcare site drawn to the sector's rules first: waitlist before gallery, written photo consent, and the two questions a parent asks before anything else.
Concept. No client, nothing shipped, no results.
Childcare · identityStudio work

A whale-and-wave mark with the line “where comfort meets care”, a light blue and pink palette, and the applications it was tested on: signage, print, garments and the landing page.
Studio work. No centre commissioned it and nothing has been measured.
All three are self-directed. No centre commissioned any of them, and nothing about them has been measured.
Compliance
Childcare in Ontario is licensed under the Child Care and Early Years Act, and photo consent is the part websites usually get wrong.
Named deliverables
Checked against the rule, then opened.
Price
How we price it
From $1,500CAD per project, plus HST
A custom site of five to ten pages covers a single centre. Multiple sites or locations add a page and a profile each. Our Wonderhill breakdown shows the structure we build to.
Add-ons: extra article $220 · extra page $450 · hourly $120. All figures are CAD and exclude tax.
Month-to-month. Cancel any time. No annual pricing exists.
Changes the price
Not included
Where we work
Waterloo Region gets in-person meetings. Everywhere else runs on a call, a written copy brief and a staging link, which is the same work.
Location pages
Questions
Licensing, hours, age groups and ratios, fees including the CWELCC reduction, and whether spots exist. Then the daily routine, food, staff qualifications, photos of the rooms, and a waitlist form asking the child's birth month and preferred start month.
Only with written consent from each family, and consent can be withdrawn at any time. We give you an editor that swaps a photo in minutes, and we can design the whole site around room photos and detail shots if you would rather show no faces.
Yes. It is the first thing parents look for, and the CWELCC reduction is confusing enough that a clear number wins the call. State the daily rate, the reduced fee and the subsidy path, and keep it current, because a stale fee is worse than none.
Say so on the page, with the month you expect openings by age group, and keep taking the form. Parents plan six to twelve months ahead. Hiding a full waitlist loses the family who would have waited.
Keep reading
Guides
Talk to us
If you would rather talk first, ask us a question. One fixed quote, in writing, after the first conversation.
A written review of what stops enquiries and what to fix first. Yours to keep.
UXPro Design Studio
| hello@uxpro.ca | |
| Hours | Monday to Friday, 9 to 5 Eastern |
| Base | Kitchener, Ontario |
| In person | Kitchener, Waterloo, Cambridge, Guelph |
Every service here ends in something you can inspect. So inspect it.